Home » Industries »
Is Your Cogeneration Plant Paying Too Much for Water and Sewer — Without Using a Single Extra Gallon?
Up to 30%
Under 0.8 psi
Lifetime
Custom
Direct answer: Municipal water meters register volume, not composition — during demand surges, gas and vapor that form inside the meter get counted as billable water even though no extra water was delivered. In a cogeneration plant, cooling tower makeup, demineralizer and boiler/HRSG makeup, and chilled water and thermal storage fills create exactly the conditions that cause this over-registration, every operating day. Because sewer charges are typically calculated from metered water intake, the same over-read inflates both bills at once. The Flow Conditioning Device (FCD) corrects this at the meter — with no change to makeup quality, cycle chemistry or plant operations — and can save up to 30% on monthly water and sewer bills.
📄 Take It With You: Free Industry PDFs
Share them with your plant engineer, facilities manager, or CFO.
See Your Savings, Hour by Hour
Pick your building type, meter size, and schedule, and see what you could save after FCD installation. No contact info required.
Every Gallon Your Meter Over-Reads Gets Billed Twice — Water and Sewer
Cogeneration plants pay for water on the way in — and again on the way out as sewer discharge. That means every gallon your meter over-reads, from gas and vapor that form inside the meter during demand surges, doesn’t just inflate your water bill. It inflates your sewer bill by the same amount at the same time. And because most cooling tower makeup evaporates, a plant without an evaporation sewer credit is already paying sewer on water that never reaches the sewer.
The FCD installs immediately after your water meter and creates a small, controlled back-pressure that extends back through the meter, holding pressure up during demand surges so far less gas and vapor form and are counted as water. No water usage reduction. Under 0.8 psi pressure loss. No operational changes. Just an accurate bill that reflects what your plant actually used.
Does Your Plant Have Any of These Signs?
These are the indicators that your water meter may be over-reading — and that you have recoverable savings on your next bill.
The plant water balance doesn’t close
Utility meter totals run ahead of tower makeup, demineralizer feed and domestic sub-meters combined.
Sewer charges outpace blowdown and drains
Sewer billed from metered intake runs well ahead of measured tower blowdown, regeneration waste and drains.
Costs jump with load swings
Water and sewer charges climb in peak cooling season, during startups and while thermal storage charges, beyond what generation explains.
Pressure swings at the service entrance
Gauges bounce when makeup valves open, demineralizers regenerate or pumps start: the same surges that drop pressure inside the meter.
Water cost per MWh above target
Water and sewer cost per MWh or per ton-hour stays above engineering baselines despite treatment and cycles improvements.
Water treated as fixed plant overhead
Utility bills accepted as fixed costs when they contain a correctable meter over-reading.
Where Water & Sewer Over-Charges Hit Your Plant
Meter over-reading doesn’t stay in the utilities budget. The inflated costs and the difficulty explaining them create problems across operations, maintenance, finance, and sustainability — all driven by the same correctable root cause.
Operations & Finance
- Water and sewer costs rising without an operational explanation
- Cost per MWh inflated by water the meter never delivered
- Sewer charges paid on over-read intake as well as evaporated water
- Bills accepted as fixed costs when they contain a correctable overcharge
- No documented baseline to present to campus or plant leadership
Plant Reliability & Compliance
- Metered intake that doesn’t reconcile with sub-meters and plant records
- Pressure swings at the service entrance during makeup and regeneration
- Management-of-change concerns about any change near the plant (the FCD sits outside the plant systems)
- Utility disputes that a passing meter test can’t settle
- Outage planning that has to account for any service-entrance work
Sustainability & ESG
- Water intensity (gallons per MWh) overstated by billing inaccuracy
- Campus or corporate water targets harder to meet from an inflated baseline
- Sewer discharge volume overstated
- Water footprint calculations built on over-read meter data
- Sustainability reports that inherit every over-read gallon
Maintenance & Equipment
- Water hammer at makeup valve closures stressing piping
- Steam trap losses driving extra makeup water
- Meter replacement that doesn’t solve the over-reading problem
- No awareness that gas and vapor formed during demand surges, not usage, are driving bills up
- Maintenance costs compounding on top of inflated utility bills
Cooling Tower Makeup Is the Biggest Meter Over-Reading Driver in Most Cogeneration Plants
Cooling towers are usually the largest water use at a CHP plant — and their makeup valves are among the most significant sources of meter over-reading. Makeup valves open and close all day as load and weather change, demineralizer trains start and regenerate to replace steam and condensate losses, and thermal storage tanks fill in large batches.
Each event sends a sudden surge through the utility meter. During every surge, pressure inside the meter drops and gas and vapor are counted as water, and that over-reading compounds across every cycle, every day. The FCD addresses it directly, holding pressure up through the meter regardless of what the plant is doing downstream.
Every Cogeneration Plant Has Savings Opportunity
Meter over-reading occurs wherever a CHP plant buys water through a utility meter and draws it in surges.
🎓
University & College Campus CHP
Central plants supplying power, steam and chilled water to campus buildings, often with large thermal storage.
🏥
Hospital & Medical Center CHP
Around-the-clock plants where reliability comes first and nothing downstream can change.
🏙️
District Energy Systems
Steam and chilled water utilities serving downtowns and multi-building sites. See District Energy.
🏭
Industrial Cogeneration
Paper, chemical, food and refining plants making their own steam and power.
♻️
Wastewater & Biogas CHP
Plants running engines or turbines on digester gas, with cooling and makeup demand.
🖥️
Mission-Critical & Data Center CHP
On-site generation with heavy cooling tower and chilled water loads. See Data Centers.
How Much Will You Save? Calculate It Now.
The Water & Sewer Bill Savings Calculator models your building’s 24-hour flow profile and estimates your savings
based on your current monthly bill — no contact information needed.
How We Get Your Plant to the True Number on Every Bill
The FCD process is straightforward, scheduled around your outage plan, and produces savings on your next full billing cycle.
1
Free Savings Analysis
We review your water and sewer bills, meter type and size, pipe size and demand profile to confirm FCD applicability.
2
Documented Projection
We give you a site-specific savings projection, up to 30% on monthly water and sewer bills, before any commitment.
3
Custom-Built FCD Installation
Built for your meter, pipe size and pressure (10″ and larger made to order), and installed immediately after the utility meter during a planned outage. Under 0.8 psi pressure loss, no operational change, documentation for your MOC review.
4
Verified Bill Reduction
Savings appear on your next full water and sewer billing cycle, documented before-and-after for management, finance and sustainability reporting.
Want to Understand Exactly How the FCD Works?
The full technical explanation of the FCD — how it holds pressure up through the meter during demand surges, the physics behind it, product specifications, certifications, and warranty terms — is on our How the FCD Works page.
More Ways Water Flow Innovations Helps
Cogeneration Plants
The FCD addresses meter over-reading — the most immediate and invisible water cost driver. If your plant also has water hammer, steam trap losses or flash steam, those are separate problems with separate solutions.
