Free Water Meter Accuracy Assessment — Find Out If Your Facility Is Over-Billed Before You Commit to Anything
Direct answer: A Water Flow Innovations meter assessment evaluates whether a facility's water meter is over-registering usage due to entrained air and turbulence — a documented, correctable phenomenon distinct from a leak or inefficient equipment. The assessment reviews metered usage history against actual facility operations, checks for the demand-event patterns (pump cycling, PRV configuration, tight piping) known to cause over-registration, and produces a documented savings projection specific to that facility's meter, pipe size, and configuration — the basis for deciding whether an FCD installation makes sense.
What a Water Meter Accuracy Assessment Actually Is — and Why It Matters Before Any Repair Decision
A water meter accuracy assessment is a structured review of your facility’s water billing data, meter specifications, pipe configuration, and operational profile to determine whether your meter is over-reading — and if so, by how much. Most commercial and industrial facilities have never had one done, because utility companies don’t offer them and most facilities accept water bills as fixed costs.
The assessment produces a documented projection of your specific savings potential before any purchase commitment. For facilities with significant monthly water bills, the assessment typically takes a few minutes of information exchange and produces a savings projection accurate enough to support a capital request, board presentation, or budget justification. There is no cost, no obligation, and no commitment required.
How We Work With Every Client
Whether you need water & sewer bill reduction, steam system repair, or both — the process starts the same way: a free analysis before any commitment.
📄
Water & Sewer Bills
Current monthly water and sewer bills — the primary input for savings projection. Historical bills help identify trends and seasonal patterns.
⚙️
Meter Type & Size
The make, model, and size of your water meter determines the degree of over-reading susceptibility and confirms the correct FCD specification.
🔧
Pipe Configuration
Pipe size and material at the meter entry point determines FCD sizing. Most configurations are straightforward — any pipe size qualifies.
🏭
Facility Type & Operations
Your industry and primary operations determine the specific over-reading drivers in your facility — irrigation cycling, CIP, cooling towers, wash cycles, and so on.
📊
Projected Savings Range
We project your specific 5–30% savings range based on all of the above — documented in writing before any purchase decision.
💳
ROI Timeline
Based on your projected savings and the FCD cost for your pipe configuration, we calculate your expected payback period — typically under 12 months for 90% of customers.
The Assessment Is Free. The Commitment Comes Later — Only If the Numbers Make Sense.
Water Flow Innovations offers the free assessment because we believe every facility deserves to know whether it’s overpaying for water before making any decision. Many facilities discover for the first time — after years of accepting inflated bills as fixed costs — that a significant portion of what they’ve been paying was never water they used.
The assessment produces a documented savings projection. If the projection supports a purchase decision, we proceed. If it doesn’t, you have better information about your facility’s water billing at no cost. There is no pressure, no sales call requirement, and no obligation to buy anything at any stage of the assessment process.
How the Assessment Works
1
Contact Us
Submit your facility details and current water bill information through our contact form or by phone at 1-844-934-8258.
2
We Review Your Data
We analyze your billing history, meter configuration, facility type, and operational profile to identify over-reading drivers and project savings.
3
You Receive the Projection
We deliver a documented savings projection specific to your facility — suitable for management review, board presentation, or budget justification.
4
You Decide
If the projection supports moving forward, we discuss FCD options, purchase or lease, and installation scheduling. No obligation at any stage.
