For Licensed Plumbing Contractors & Pipefitters

You’re Already Standing at the Meter Connection. The FCD Installs Between Two Pipe Joints in Under an Hour — and Reduces Your Client’s Water & Sewer Bill 5–30% From the Next Billing Cycle.

The FCD (Flow Conditioning Device) corrects water meter over-reading at the municipal supply connection. Every commercial building you service with a cooling tower, process water system, CIP line, boiler, or high-frequency fixture demand is a candidate. No special tools. No pipe reconfiguration. No downtime beyond the installation window. Submit five parameters from the job site and get the correct model confirmed within one business day.

5–30%

average water & sewer bill reduction for client

1hr

typical installation at meter connection

Negligible

pressure loss — no downstream impact

1 Day

sizing confirmation turnaround

Every Commercial Service Call Is a Potential FCD Opportunity — If You Know What to Look For

You’re inside commercial buildings constantly — servicing backflow preventers, replacing PRVs, maintaining water heaters, responding to leak calls, doing meter pit work. You’re standing at the municipal supply connection more often than anyone else who touches that building. The FCD installs at that connection. Once you know what you’re looking at, every qualifying commercial account you service becomes a candidate for an upsell conversation that delivers real, documentable value to your client.

🔩

Fits Between Two Pipe Joints — No Reconfiguration

The FCD installs in the existing meter connection assembly without modifying upstream or downstream piping. If you can access the meter connection, you can install the FCD. No special tools required beyond standard pipe work.

⏱️

Under an Hour Typical Installation

At a standard commercial supply connection, a licensed plumber familiar with the FCD can complete installation in under an hour. The meter connection is already accessible. No wall opening, no pipe rerouting, no system shutdown beyond isolating the supply connection.

💰

High-Margin Upsell on an Existing Service Call

You’re already on-site for another reason. The trip charge is already covered. Adding an FCD installation to a backflow preventer service call, PRV replacement, or annual meter pit inspection turns a standard service ticket into a significantly higher-value visit for both you and your client.

📄

Documented Client Value — Easy Referral Story

The savings appear on the client’s next water and sewer bill — before and after, documented on the utility statement. That’s a concrete result your client can point to. A client who sees a 15% reduction on their water bill tells their property management contacts about the plumber who made it happen.

♾️

Lifetime Warranty — Zero Callback Risk

The FCD carries a lifetime transferable warranty from Water Flow Innovations. If there’s ever a product issue, WFI handles it. Zero callback liability for the installing contractor on the FCD itself beyond standard pipe joint workmanship.

↩️

180-Day Money-Back Guarantee to Your Client

If the building owner isn’t satisfied within 180 days of installation, Water Flow Innovations issues a full product refund directly to the client. You’re not on the hook for the performance guarantee — WFI is. That makes the sales conversation straightforward.

The Five-Minute Conversation That Turns a Service Call Into an FCD Installation

You don’t need a sales script. You need to know what you’re looking at and have a straightforward way to explain the value. Here’s how the conversation typically goes when you’re already on-site for another reason.

Example: You’re servicing a backflow preventer at a senior living facility. You’ve just finished the test. The facilities manager is standing with you at the meter pit.

You

“While I’m here — do you know if your water bills have been running higher than you’d expect for this size facility?”

FM

“Honestly, yeah — our utility costs have been climbing and nobody’s been able to explain it.”

You

“There’s a device called a Flow Conditioning Device that installs right here at your meter connection — between these two joints. What it does is correct the way your meter reads during demand cycling events — laundry, kitchen, HVAC — when the meter tends to over-register. Facilities like this one typically see their water and sewer bill drop 5 to 30 percent. Installs in about an hour, negligible impact on your water pressure anywhere in the building.”

FM

“How does it work and what does it cost?”

You

“I need to submit your pipe size, meter size, and a couple of other parameters to get the right model confirmed — takes me about five minutes right now. They come back within a day with the correct device and the exact spec. I can get you a quote with everything included — device and installation — before I leave today if you want.”

The conversation trigger doesn’t have to be a complaint. Any of these situations opens the door naturally:

Backflow Preventer Service

You’re already at the meter connection. The five parameters are visible or measurable on-site. Natural opening: “While I’m here at your meter connection, have you heard of the FCD?”

PRV Replacement or Adjustment

You’re working immediately adjacent to the FCD installation point. The PRV configuration is one of the five sizing parameters — you already have it in your notes.

Annual Meter Pit Inspection

You’re documenting the meter pit anyway. Adding five parameter measurements takes two minutes. Submit the sizing request before you leave the pit.

New Water Heater or Boiler

Boiler feedwater cycling is one of the strongest FCD over-reading sources. If you’re installing or servicing a commercial boiler, the building is likely a strong FCD candidate.

Leak Investigation or High Bill Complaint

A client who called you because their water bill is high is already primed for the FCD conversation. The problem they called you about is the opening.

New Construction Rough-In

If the FCD is not already in the construction documents, you can recommend it at rough-in. Installs in the existing meter connection sequence — no redesign required.

Where the FCD Installs and What
You Need to Know

The FCD installs immediately downstream of the utility water meter — before the PRV, before the backflow preventer, before building distribution. It occupies the space between two pipe joints in the existing meter connection assembly. No additional pipe run length is required in most installations.

1

Municipal
Main

utility side

2

Water
Meter

utility meter

3

FCD

installs here

4

PRV

if present

5

Backflow
Preventer

RPZ or DCVA

6

Building
Supply

domestic & process

Installation Facts

Installs between two pipe joints — no pipe reconfiguration
Position: immediately downstream of the utility meter
Material: 316L stainless steel — compatible with all standard pipe types

Negligible pressure loss — no downstream pressure adjustment required

No special tools beyond standard pipe work
Typical installation time: under one hour at a standard commercial connection
No system downtime beyond isolating the supply connection during installation
No maintenance required after installation

What to Check Before Submitting a Sizing Request

Pipe size at the meter connection (nominal diameter)
Utility meter size — on the meter face or utility service agreement
Whether a PRV is present and its location relative to the meter
Backflow preventer type — RPZ assembly or double check valve assembly
Static supply pressure — from utility zone data or field measurement
Any unusual meter pit configuration, dual meters, or non-standard connection sequence

Taxes or regulatory fees

For retrofit: note any existing unions or couplings that may affect fit

Sizing From the Job Site — Five Parameters, One Business Day

The FCD is available in multiple configurations for different pipe sizes, meter types, and pressure conditions. Correct model selection requires five parameters from the job site. You can gather all five in under five minutes while you’re already at the meter connection — then submit the sizing request form before you leave the site. WFI confirms the correct model within one business day.

1

Pipe Size

Nominal pipe diameter at the meter connection. Read from the pipe itself or the meter pit documentation.

2

Meter Size

The utility meter size — typically printed on the meter face or listed on the utility service agreement.

3

PRV Present?

Is a pressure reducing valve present? If yes, note its location in the connection sequence relative to the meter.

4

Backflow Type

RPZ (reduced pressure zone) assembly or DCVA (double check valve assembly)? Note the manufacturer and model if visible.

5

Static Pressure

Static supply pressure at the meter — from your pressure gauge, utility zone pressure data, or the building’s existing pressure records.

📱 Submit the Sizing Request From the Job Site

Use the sizing request form on this page or scan the QR code on your WFI field reference card. Submit your five parameters, the facility type, and your contact information. WFI will confirm the correct model designation and provide ordering information within one business day — before your next visit to the site.

Gather 5 parameters at the meter connection — takes under 5 minutes
Submit sizing request form from your phone before leaving the site
WFI confirms correct model within 1 business day
Order the confirmed model, schedule installation, deliver client savings

FCD Sizing Request — Submit From the Job Site

Five parameters plus your contact info. WFI responds with the confirmed model designation and ordering information within one business day.

ⓘ Fields marked with * are required for sizing confirmation. If you don't have a parameter on-site, enter your best estimate or "unknown" and note it in the Additional Notes field — WFI will follow up to confirm before finalizing the model designation.
Job Site Information
Five Sizing Parameters — Measured or Observed at the Meter Connection
Your Contact Information
Your information is used only to respond to this sizing request and confirm the correct FCD model for your job site. Water Flow Innovations will contact you within one business day with the confirmed model designation and ordering information.

The Commercial Accounts Most Likely to Qualify on Your Route

The FCD delivers the strongest savings at commercial facilities with variable water demand cycling — cooling towers, process water systems, CIP lines, boilers, high-frequency fixture demand, or combination HVAC and process operations. These are the account types to look for on your existing commercial route.

🏠

Senior Living & Assisted Living

Commercial laundry cycling, kitchen, HVAC cooling tower, and high-frequency bathing fixtures. Strong candidate on nearly every account.

🏨

Hotels & Motels

Laundry, commercial kitchen, pool heating, cooling tower makeup. Multiple simultaneous cycling sources on every property.

🏭

Food Processing & Manufacturing

CIP system cycling, wash-down, process water batch demand. Some of the highest over-reading rates of any facility type.

🏥

Healthcare & Medical Facilities

Sterile processing equipment cycling, commercial laundry, cooling tower, and high-frequency restroom fixture demand.

🏢

Multifamily & Apartments

High-rise buildings with boiler feedwater cycling, simultaneous fixture demand, and cooling tower HVAC operations.

🎓

Schools & Universities

Commercial kitchen, HVAC cooling tower, laboratory process water, and concentrated fixture demand during class changes.

🚗

Car Washes

High-pressure wash cycles, rinse arches, and recirculation system makeup water create intense demand cycling at the supply meter.

🍽️

Restaurants & Food Service

Commercial dishwasher cycling, prep sink demand, and kitchen operations create repeated demand surge events throughout every service period.

🏪

Supermarkets & Grocery

Commercial kitchen, deli, bakery, produce misting, and HVAC operations. Large format stores have strong savings potential.

🖥️

Data Centers

Cooling tower makeup water cycling is continuous and variable throughout every operating hour — strong FCD candidate at any facility with evaporative heat rejection.

Contractor Pricing & Margin Program

Water Flow Innovations works directly with licensed plumbing contractors and pipefitters on trade pricing. The FCD is priced to allow a meaningful contractor margin when sold and installed at commercial accounts — making it a viable upsell addition to your existing commercial service business.

How Contractor Pricing Works

  • Contractor trade pricing is available to licensed plumbing contractors and commercial service firms. Trade price is set below the published retail price to allow contractor markup when sold to building owners as a supplied-and-installed service.
  • Pricing is confirmed directly with Water Flow Innovations — contact WFI using the form below or by phone to discuss trade pricing for your firm. Volume arrangements are available for contractors who regularly service commercial accounts in WFI’s core industries.
  • The FCD is sold as a supply-and-install package that you quote to the building owner — product plus your installation labor. The building owner pays your invoice. WFI provides the product at trade price. You retain your labor margin and product markup.

What’s Included With Contractor Orders

  • FDA tobacco product manufacturing records showing water input volumes based on over-read intakeEvery FCD order includes installation instructions, product data sheet, and sizing confirmation documentation — the paperwork your client may need for facilities records, warranty registration, or building management documentation.
  • WFI provides a client-facing one-page summary of documented savings expectations that you can leave with the building owner after installation — reinforcing the value of the installation and your role in delivering it.
  • For contractors who want to discuss the program before their first order, WFI is available for a direct conversation about the product, sizing process, installation requirements, and pricing structure.

Common Questions — Contractors & Installers

Do I need any special tools or certifications to install the FCD?
No special tools beyond standard commercial pipe work are required. The FCD installs between two pipe joints at the meter connection using standard connection methods for the pipe material and size at that location. Any licensed plumber with commercial service experience can install the FCD. No manufacturer certification or special training is required before your first installation — WFI provides installation instructions with every order, and the sizing confirmation response includes any model-specific installation notes.
What if I can't get all five parameters on-site?
Submit what you have and note the missing parameters in the Additional Notes field. WFI will follow up to confirm missing information before finalizing the model designation — typically by phone or email the same business day. For parameters that require utility confirmation (meter size, zone pressure), WFI can advise on how to obtain them from the utility before the next site visit. Don’t let a missing parameter stop you from submitting — a partial submission starts the conversation and gets you a response faster than waiting until you have everything.
Can I submit a sizing request from my phone while I'm at the job site?
Yes — the sizing request form on this page is fully mobile-optimized. You can complete and submit it from your phone while standing at the meter connection. WFI will respond to the email address you provide within one business day. If you’re a regular WFI contractor, ask about the field reference card — a laminated one-page reference with a QR code that goes directly to the sizing request form, designed to live in your truck.
What's my liability if the building owner doesn't see the expected savings?
Your installation liability is the same as any standard pipe work — proper installation of the specified product per manufacturer’s instructions. The savings performance guarantee runs directly between Water Flow Innovations and the building owner through WFI’s 180-day money-back guarantee — it is not your liability as the installing contractor. If the building owner is dissatisfied within 180 days, they contact WFI directly for the product refund process. Your labor charge for the installation is separate from the product guarantee.
Does the FCD require any permits or inspections?
Permit requirements vary by jurisdiction. In most commercial applications, installing a device at the meter connection on the building side of the meter is treated the same as any other plumbing connection work at that location — subject to the same permit requirements as a PRV replacement or backflow preventer service in your jurisdiction. WFI recommends following your local AHJ (Authority Having Jurisdiction) requirements for meter connection work. WFI can provide product documentation for permit submittals upon request.
Can I recommend the FCD on a new construction project even if it's not in the spec?
Yes — if the FCD is not in the construction documents and you’re doing the plumbing rough-in, you can recommend it to the general contractor or building owner as a value-add at the meter connection. The installation sequence is the same as new construction — it drops into the meter connection assembly before the PRV and backflow preventer. If you want the FCD to be in future construction documents for repeat clients, ask WFI about connecting with the project’s MEP engineer for future phases or similar projects.
Under 1 hour to install | 5–30% client savings | Zero callback risk | 180-day guarantee

Ready to Add the FCD to Your Commercial Service Offering?

Submit a sizing request from your next commercial service call — or contact Water Flow Innovations directly to discuss contractor pricing, the margin program, and field reference cards for your truck.
0
    0
    Your Cart
    Industries